From bricks to rafter raising, to windows and doors, watch the progress on our school.
Two workers begin the excavation of the foundation of Wunlang School, and then our treasurer Ron Moulton lends a hand.
Two workers begin the excavation of the foundation of Wunlang School, and then our treasurer Ron Moulton lends a hand.
Original size: 640px x 426px |
Current: 400px x 266px |